PHOTO #4 Removed tube sample
NOTE: Failure in tube
PHOTO #4
Bottom Half - Note Minimal Corrosion
Liquid
PHOTO #5 Severe groove depth adjacent
to edge of support
PHOTO #6
PHOTO #7
PHOTO #8
PHOTO #5
Top Half - Note Corrosion
PHOTO #6
Bottom Half - Note Minimal Corrosion
PHOTO #7 Cross Section
Tube split to show top & bottom
-
Left & right sides show minimal corrosion. Liquid covered.
-
Inner left & right (top circumference of tube) show heavy corrosion. Liquid/Vapor.
PHOTO #8
Top Half - Note Corrosion
Unexpected Tube Failure in
HDS Stripper OVHD Air Cooler
chronicle companion images
PHOTO #2
NOTE: Close up of Failure
PHOTO #1
Top half of tube looking at failure
PHOTO #3
Top Half of Tubing - Note Corrosion
Liquid/Vapor
Company Policy Page 2 of 2
Interactive Hover Boxes - Listed Alphabetically
Play button for Slide Show
M
making the call 3 of 9
taking time on inspection call
MO
DEFECT DEPTHS
-
Do not rush a call
-
Take time to review all aspects of inspection data
-
Don't rush call because plant contact is there
-
Sleep on it
-
Test it, pick at it, scrape it, brush it, measure it
There is usually always time to make a decision on defect depths.
M
making the call 9 of 9
REPORTS
MO
... are the method where we transfer inspection info to our clients
REPORTS
-
Read your reports for clarity
-
Describe the corrosion in full ideas and sentences
-
Bring reader to the exchanger by your descriptions
-
Reads well, makes sense, has enough specificity?
-
Do the photos support the words?
-
Look at a report like a puzzle; are all the pieces there?
M
making the call 8 of 9
INTEGRITY
MO
All we have is our integrity and word
Integrity
-
Hold to higher standard
-
Race won in last 50 meters, finish line in view turn up gas
-
Admit mess ups, let it be known early
-
Dress the part and exhibit it in your life
-
1 misstep destroys more integrity than imagined
-
Integrity is earned by incremental steps